Från bokens innehåll
Resultat 1-3 av 67
Sida 1446
Balance of the walls were partly solid basic and partly veneered with basic brick.
Primary purpose of this experimental installation was to obtain granular, easily
removed slag. Success of this installation led them to convert a 180-ton furnace
to ...
Balance of the walls were partly solid basic and partly veneered with basic brick.
Primary purpose of this experimental installation was to obtain granular, easily
removed slag. Success of this installation led them to convert a 180-ton furnace
to ...
Sida 1628
The basic end furnace has less out time for repairs due to first, less repairs being
necessary and second, the repair being made faster. Out time on basic end
furnaces averaged 154 hours per furnace less than silica furnaces for the year
1947.
The basic end furnace has less out time for repairs due to first, less repairs being
necessary and second, the repair being made faster. Out time on basic end
furnaces averaged 154 hours per furnace less than silica furnaces for the year
1947.
Sida 2228
Thus, while silica sprung roofs have a considerable area of fully expanded brick
over which the roof thrust is distributed, in basic sprung roofs, the tendency is for
the load to concentrate at or near the hot face where maximum expansion has ...
Thus, while silica sprung roofs have a considerable area of fully expanded brick
over which the roof thrust is distributed, in basic sprung roofs, the tendency is for
the load to concentrate at or near the hot face where maximum expansion has ...
Så tycker andra - Skriv en recension
Vi kunde inte hitta några recensioner.
Innehåll
No | 1157 |
Forging and Heat Treating of Oil Well Sucker Rods | 1172 |
Wall | 1191 |
10 andra avsnitt visas inte
Andra upplagor - Visa alla
Vanliga ord och fraser
addition alloy American annealing application atmosphere automatic basic brick Bulletin burners capacity castings charge Chicago cleaning Cleveland coating COMPANY complete construction continuous conveyor cooling Corp cost Detroit developed Division drying economical effect efficiency Electric Engineering equipment finishing firing flame flow fuel furnace give handling hardening hearth heat heat treating heater illustrated increased Industrial installation insulation iron load lower machine manager manufacturer materials melting ment metal method MICHIGAN Model obtained Ohio open hearth furnace operation oven oxygen pipe Pittsburgh plant practical present pressure Price problems production protection quenching range recently reduced refractory resistance shown shows standard steel supply surface tank temperature tion trays tube unit valve wall wide wire Write York